Realized projects
Whether it's a digital twin, digital tracking systems or BIM2LOG: Our toolbox is packed to the brim. Read how construction sites become buildings.
KSSG — OKS Spital St.Gallen
The St. Gallen Cantonal Hospital and the Eastern Switzerland Children's Hospital were expanded with a modern new building while hospital operations continued. Emergency room access, foot traffic and REKA approach had to be taken into account when planning the construction process. A particularly exciting operation for us.
CTB Clara Tower Basel
Problems with bottlenecks on the construction site? Thanks to a digital twin, you can build more efficiently and close information gaps with BIM2LOG.
pRED Roche Basel
The construction of the Roche pRED Research Center is a mammoth project in the middle of a residential area in Basel. Thanks to just-in-time, we have massively increased efficiency.
Migros Zurich
The rebuild of Migros branches must be quick. Time-optimized planning and construction (TOPB) can cut the construction phase by half. The result: lower costs and satisfied customers.